brand

SATCON

Extra High Voltage Engineering Consultancy Services

  • Engineering Consultant for Design, Engineering and Consultancy Services for Extra High Voltage Substations, Transmission Lines, Electrical Balance of Plant (EBOP) of Thermal Power Plants, Large Electrical Systems (HV/MV) of Steel plants, Coal & Iron Handling Plants & Misc. Industries, Electrical System studies using ETAP 2020.

    Are you looking for Extra High Voltage Engineering Consultancy Services in Kolkata ? We are providing the same for Substations and Transmission Lines upto 765kV Voltage level.

  • Engineering Consultant for Design, Engineering and Consultancy Services for Extra High Voltage Substations, Transmission Lines, Electrical Balance of Plant (EBOP) of Thermal Power Plants, Large Electrical Systems (HV/MV) of Steel plants, Coal & Iron Handling Plants & Misc. Industries, Electrical System studies using ETAP 2020.

    Are you looking for Extra High Voltage Engineering Consultancy Services in Kolkata ? We are providing the same for Substations and Transmission Lines upto 765kV Voltage level.

Gujarat - Detail Design and Engineering services for the Construction of 2x15 MVA, 66/11 KV GIS substation including all indoor and outdoor works of the substation Indian Port Rail & Ropeway Corporation Limited for Development of National Maritime Heritage complex at Lothal, Gujarat (South Infra) (Photo is symbolic, not actual)

Scope of Work :

1. Complete Electrical, Civil and Structural Detail Design and Engineering services for the Construction of 2x15 MVA, 66/11 KV GIS substation including all indoor and outdoor works of the substation.

2. Detailed BOQ for Electrical, Civil, Structural works in excel and PDF format.

3. Preparation of Technical specifications of various EHV, HV, and LV equipment of the substation.

4. Vendor drawing review and approval of different electrical equipment.

5. Providing technical assistance to DCEPL by telephone/online meet/physical mode for obtaining approval of drawings from IPRRCL.

6. Witnessing of FAT at manufacturer’s works.

7. Supervision of maximum 90 calendar days duration of Electrical erection, testing and commissioning of the substation.


Back to projects