Extra High Voltage Engineering Consultancy Services

  • Engineering Consultant for Design, Engineering and Consultancy Services for Extra High Voltage Substations, Transmission Lines, Electrical Balance of Plant (EBOP) of Thermal Power Plants, Large Electrical Systems (HV/MV) of Steel plants, Coal & Iron Handling Plants & Misc. Industries, Electrical System studies using ETAP 2020.

    Are you looking for Extra High Voltage Engineering Consultancy Services in Kolkata ? We are providing the same for Substations and Transmission Lines upto 765kV Voltage level.

  • Engineering Consultant for Design, Engineering and Consultancy Services for Extra High Voltage Substations, Transmission Lines, Electrical Balance of Plant (EBOP) of Thermal Power Plants, Large Electrical Systems (HV/MV) of Steel plants, Coal & Iron Handling Plants & Misc. Industries, Electrical System studies using ETAP 2020.

    Are you looking for Extra High Voltage Engineering Consultancy Services in Kolkata ? We are providing the same for Substations and Transmission Lines upto 765kV Voltage level.

Jharkhand - Construction of 33/11kV, 2 x 3.15MVA, 2 x 1MVA Substation for Piparwar-I Underground Coal Mine (CM+LHCM) MDO Central Coalfields Limited, Chatra (Job entrusted by Shahbad Engineers, Jamshedpur)

Scope of Work :

1. Preparation of the following Electrical, civil, structural and fire detection and alarm system drawings.

1 Electrical Drawings :
   
1.1 Sag & Tension calculation of overhead strung bus
1.2 Short circuit force calculation of overhead strung bus
1.3 Short circuit force calculation of rigid tubular bus
1.4 Erection key diagram plan & elevation
1.5 Outdoor cable trench electrical layout plan and sectional details
1.6 Power and Control cable schedule and interconnection diagram
1.7 Below Ground Earthing layout and details
1.8 Above ground Earthing layout and details 
1.9 DSLP Layout of 33kV Switchyard and Control building
1.10 Protection and metering SLD of 33/6.6/0.433kV Surface substation
   
2 Steel Structural drawings :
   
2.1 33kV Line gantry tower - 7m high, T7/T8/T9/T10
2.2 33KV Line gantry beam-5.5m span, B1
2.3 33kV Bus gantry tower - 6m high, T5/T6/T11/T12
2.4 33KV Bus gantry beam - 5.5m span, B2
2.5 15m high Lightning mast, T1/T2/T3/T4
2.6 33kV LA support structure
2.7 33kV CT support structure
2.8 33kV BPT support structure
2.9 33kV Isolator with ES support structure
2.10 33kV Isolator without ES support structure
2.11 33kV DO Fuse support structure
2.12 33kV High level BPI support structure
   
3 Structural Design calculation :
   
3.1 33kV Line gantry tower, T7/T8/T9/T10
3.2 33KV Line gantry beam, B1
3.3 33kV Bus gantry tower, T5/T6/T11/T12
3.4 33KV Bus gantry beam, B2
3.5 Lightning mast, T1/T2/T3/T4
3.6 33kV LA support structure
3.7 33kV CT support structure
3.8 33kV BPT support structure
3.9 33kV Isolator with ES support structure
3.10 33kV Isolator without ES support structure
3.11 33kV DO Fuse support structure
3.12 33kV High level BPI support structure
   
4 Civil foundation drawings :
   
4.1 Foundation of 33kV Line gantry tower, T7/T8/T9/T10
4.2 Foundation of 33kV Bus gantry tower, T5/T6/T11/T12
4.3 Foundation of 15m high Lightning mast, T1/T2/T3/T4
4.4 Foundation of 33kV LA support structure
4.5 Foundation of 33kV CT support structure
4.6 Foundation of 33kV BPT support structure
4.7 Foundation of 33kV Isolator with ES support structure
4.8 Foundation of 33kV Isolator without ES support structure
4.9 Foundation of 33kV DO Fuse support structure
4.10 Foundation of 33kV High level BPI support structure
4.11 Foundation of 33kV CB 
4.12 Overall foundation layout
   
5 Civil foundation design calculation of :
   
5.1 33kV Line gantry tower, T7/T8/T9/T10
5.2 33kV Bus gantry tower, T5/T6/T11/T12
5.3 Lightning mast, T1/T2/T3/T4
5.4 33kV LA support structure
5.5 33kV CT support structure
5.6 33kV BPT support structure
5.7 33kV Isolator with ES support structure
5.8 33kV Isolator without ES support structure
5.9 33kV HG Fuse support structure
5.10 33kV High level BPI support structure
5.11 33kV CB
   
6 Architectural Drawings :
   
6.1.1 Architectural layout plan and elevation of Control and 11kV Switchgear building with Door and Window schedule and finish details
   
7 Civil Design and Drawings :
   
7.1 Civil Drawings
7.1.1 GA & RC details of Foundation and Oil pit of 3.15MVA Transformer
7.1.2 GA & RC details of Foundation and Oil pit of Auxiliary Transformer
7.1.3 GA & RC details of Foundation and Oil pit of SAT-1 & SAT-2
7.1.4 GA & RC details of Fire wall of SAT-1 & 2
7.1.5 GA & RC details of Outdoor cable trenches and cover slab in 33kV Switchyard
7.1.6 GA & RC details of Indoor cable trenches in Control building and Capacitor building
7.1.7 Constructional details of Internal road 
7.1.8 GA drawing of Pathway with interlocked tiles
7.1.9 GA & RC details of the Burnt oil tank (BOT)
7.1.10 GA & RC details of foundation, column, plinth beam, roof beam, roof slab, lintel beam, stair case of Control & Switchgear building
7.1.11 Misc. details of the Switchgear cum control building
7.1.12 Switchyard drainage layout plan and sectional details
7.1.13 GA & RC details of the following :
  - NIFPS
  - NGR (76.21 ohm)
  - NGR (320 ohm)
7.1.12 Constructional details of Boundary wall
   
7.2 Civil Design calculations for :
   
7.2.1 Foundation and Oil pit of 3.15MVA Transformer
7.2.2 Foundation and Oil pit of Auxiliary Transformer
7.2.3 Foundation and Oil pit of SAT-1 & SAT-2
7.2.4 Fire wall of SAT-1 & 2
7.2.5 Outdoor cable trenches RCC and cover slab
7.2.6 Indoor cable trenches in Control building and Capacitor building
7.2.7 Foundation, column, plinth beam, roof beam, roof slab, lintel beam, stair case of Control & Switchgear building
7.2.8 Design calculation of Boundary wall
7.2.9 Design calculation of Internal road 
7.2.10 GA drawing of Pathway with interlocked tiles
7.2.12 Design calculationof the Burnt oil tank (BOT)
7.2.13 Design calculation of the following :
  - NIFPS
  - NGR (76.21 ohm)
  - NGR (320 ohm)
   
8 Fire fighting system :
   
8.1 Fire detection and alarm system (FDA) layout plan and installation details
8.2 Layout of Indoor sprinkler system
8.3 Layout drawing of Sand pit and bucket for fire fighting

2. Supervision of erection, testing, commissioning and civil works at site by deputing engineers at site office.

3. Vendor drawing review and approval.

 

 


Back to projects