logo

SATCON

ISO 9001-2015 Certified

(Design, Engineering and Consultancy Services for
EHV Substations, EBOP of Thermal Power Plants & Large Electrical Systems of Steel plants, Coal & Iron Handling Plants & Misc. Industries

iso
iso

Our Completed Project Outside India

Lalmatia

Independent Design Reviewer service for various buildings of New Port project in Qatar (On behalf of Shapoorji Pallonji Qatar WLL)

The scope of work shall include the following works :

 

a.      Review, comments, finalization and stamping of earthing schematics, earthing layout, earthing calculations and lightning protection layout drawings of the following buildings of NPP 0032 :

      i.          GCT office building (bldg.. no. 2.1)

      ii.         GCT Transit shed-1 (bldg.. no. 2.2.1)

      iii.        GCT Transit shed-2 (bldg.. no. 2.2.2)  

      iv.        GCT Equipment maintenance workshop (bldg. no. 2.3)

      v          GCT Refrigerated storage building  (bldg. no. 2.5)

      vi.        GCT Entry/Exit gate complex (bldg. no. 2.10)

      vii.       MUT office building (bldg.. no. 3.2)

      viii.      MUT Food office building (bldg.. no. 3.9)

      ix.        MUT Entry/Exit gate complex (bldg. no. 3.10)

      x.         OST office building (bldg.. no. 5.1)

      xi.        OST Equipment maintenance workshop (bldg. no. 5.4)

      xii.       OST Entry/Exit gate complex (bldg. no. 5.10)

b.      Lightning protection risk assessment calculation and Lightning protection system design calculation as per IEC 62305-2,3.

c.      Represent AFCONS for design review meetings/workshop meetings with NPP/PMC/EDC if required.

Back to List of Projects